This document outlines the template for an Engineering, Procurement, and Construction (EPC) contract specifically tailored for a rooftop Solar Power Project.
Who has been notified as successful bidder for roof top solar metering?
REAS:A. The Power Producer has been notified as successful bidder by <Name of ExpertPSU> for "Design, Supply, Installation andCommissioning of Roof TopSolar Photovoltaic Systems onNet metering (as per KERC Regulations) – On the Rooftop of Government Buildings (approximately ____kWp)" hereinafter refe re
How long is a solar PV rooftop power plant warranted?
The mechanical structures, electrical components including evacuation infrastructure and overall workmanship of the Solar PV Rooftop power plant system must be warranted for a minimum of 5years from the date of commissioning and handing over of the system. 3.
How to generate solar power for commercial installations?
For large PV system (Above 100 kW) for commercial installation having large load, the solar power can be generated at low voltage levels and stepped up to 11 kV level through the step up transformer. The transformers and associated switchgear would require to be provided by the SPV bidders.
What is grid tied solar rooftop photovoltaic (SPV) power plant?
A Grid Tied Solar Rooftop Photo Voltaic (SPV) power plant consists of SPV array, Module Mounting Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT), Inverter, and Controls & Protections, interconnect cables, Junction boxes, Distribution boxes and switches.
What does PR mean in a solar power purchase agreement?
D. The Purchaser has agreed to purchase the entire Solar Power generated by the Project on the terms and conditions contained in this Agreement. capacity at any instance with respect to the radiation measured. PR = (Measured output in kW / Installed plant capacity in kW X 1000 W/m2 / Measured radiation intensity in W/m2).
Effective Date of the Contract The Effective Date of the Contract shall be the date of release of Advance. The contract shall be in force till successful handover of <Capacity> kW On-Grid Roof Top Solar Power Project and Completion of Defect Liability Period. 5.